SOA Category OG11
Icona tecnologia

SOA Category OG11

Certification for integrated technological systems (plumbing, HVAC, electrical)

The OG11 category applies to works where multiple technological systems are installed or managed simultaneously within the same site and project. It is strategic for tenders requiring coordination of plumbing, thermal/HVAC, and electrical systems, strengthening the company’s positioning in both public and private sectors. The declaratoria emphasizes the functional integration and inseparability of OS3–OS28–OS30 activities.

OG11

Simulate the cost of SOA certification

Calculate fees and requirements

Technical and organizational requirements

To fall under OG11, the project must include the joint installation or maintenance of:

  • OS3 – Plumbing, water-sanitary systems, kitchens, laundries
  • OS28 – Heating, thermal and air-conditioning systems
  • OS30 – Electrical, telephone, radio-television systems

Minimum incidence on total project value:

  • OS3 ≥ 10%
  • OS28 ≥ 25%
  • OS30 ≥ 25%

CEL Requirements for OG11 (simultaneous execution on the same site):

  • OS3: at least 40% of the total work
  • OS28: at least 70%
  • OS30: at least 70%

CELs must indicate the total OG11 works and the individual values for OS3, OS28, OS30.

Related SOA Categories

OG11 may interface with:

  • OG1 / OG2 – when systems are part of civil/industrial buildings or listed heritage assets
  • OG3 and other OG categories – when infrastructures require integrated systems
  • Other OS categories – special networks, fire systems, supervisory systems, etc.

Technical Datasheets (PDF)

Download now

FAQ

FAQ
SOA Category OG11

What is the official “declaratory” of OG11?

OG11 concerns the installation, management and maintenance of coordinated, functionally interconnected technological systems that cannot be executed separately, corresponding to OS3, OS28 and OS30.

When does a project fall under OG11?

Only when OS3 + OS28 + OS30 are present together in the same site and the same contract, fully integrated.

If only two systems are present (e.g., OS3 + OS28), is it OG11?

No. Without the OS3–OS28–OS30 triad, it is not OG11.

Why is OG11 considered a modern and highly requested category?

Because it certifies the capability to integrate multiple systems: electrical, HVAC, water, automation, safety, and energy. It represents digital and energy transition (smart buildings, hospitals, green schools, IoT infrastructure).

Difference between OG11 and OS categories:
  • OS3 → Plumbing and water-sanitary systems
  • OS28 → HVAC and thermal systems
  • OS30 → Electrical and special systems

OG11 certifies their integration.

Strategic fields for OG11 today:
  • Smart buildings and public automation
  • Energy efficiency (PV integration, heat pumps, sensors)
  • Transport infrastructure (stations, airports, tunnels with integrated systems)
  • Data centers and digital infrastructure (cooling + continuity power + security)
What does being OG11-qualified mean in 2025?

It means being prepared for opportunities in energy efficiency and digitalized infrastructure, where systems are integrated into unified control environments.

Which SOA categories are most closely related to OG11?
  • OS3 – Plumbing and water-sanitary systems, kitchens, laundries
  • OS28 – Heating, thermal and air-conditioning systems
  • OS30 – Electrical and special systems
  • OG1 – Civil and industrial buildings (when the systems component is predominant)

OG11 acts as a technical bridge between these categories, enabling companies to carry out complex projects that integrate all of them.

CEL Requirements

CELs must certify the simultaneous execution of OS3 + OS28 + OS30 with minimum economic incidence thresholds (10/25/25 and 40/70/70). A CEL for a single system is not sufficient.

The OG11 category is the core of integrated technological systems: it certifies organizational capacity, coordination skills, and the ability to manage complex projects with a high technological and systems-engineering component.

Your next step?
Verify the minimum incidence thresholds (10/25/25), consolidate CELs with joint execution (40/70/70), and ensure you have the appropriate OG11 classification. If needed, integrate complementary categories and focus on innovation and training to enhance efficiency (HVAC, automation/BMS, monitoring) in OG11 tenders.

CONTACT US

Example Calculation – Category OG11 (Class III-bis request)
Requested amount: €1,500,000

 

Total works required: 2.430.000 = (1.500.000×180%=2.700.000×90%)
OS3 540.000 = (1.500.000×90%)x40%
OS28 945.000 = (1.500.000×90%)x70%
OS30 945.000 = (1.500.000×90%)x70%
Breakdown: Peak works must be calculated for each OS category individually.
OS3 1 lav. al 40%: 240.000 = (1.500.000×40%)x40%
2 lav. al 55%: 330.000 = (1.500.000×55%)x40%
3 lav. al 65%: 390.000 = (1.500.000×65%)x40%
OS28 1 lav. al 40%: 420.000 = (1.500.000×40%)x70%
2 lav. al 55%: 577.500 = (1.500.000×55%)x70%
3 lav. al 65%: 682.500 = (1.500.000×65%)x70%
OS30 1 lav. al 40%: 420.000 = (1.500.000×40%)x70%
2 lav. al 55%: 577.500 = (1.500.000×55%)x70%
3 lav. al 65%: 682.500 = (1.500.000×65%)x70%